Drone photo of Park Bridge completed in 2015 in Kicking Horse Canyon shows challenge of highway widening through the Rocky Mountains. (Ministry of Transportation)

Kicking Horse widening budget up $151 million as bidders invited

Union-only construction adds 5.8% to price of B.C.’s toughest project

B.C.’s transportation ministry is inviting bids to design and build the most difficult highway project in the province’s history, with costs going up, mainly due to union-only construction and engineering changes.

The latest cost estimate for the fourth phase of the Kicking Horse Canyon widening project is $601 million, a $151 million increase since the 2016 project budget. The ministry estimates that $35 million of that is to implement the NDP government’s “community benefits agreement” for public construction projects, requiring worker membership in approved building trades unions.

Other increased costs include additional geotechnical and other engineering work, additional foundation supports for bridges and retaining walls, consultation with Indigenous communities and a bigger contingency fund due to the risk and complexity of the project.

Phase four is four-laning of the final section of Kicking Horse Canyon east of Golden, 4.8 km from West Portal to Yoho Bridge. Construction is slated to begin in the summer of 2020, with completion by the winter of 2023-24.

The cost increase also includes an additional $23 million in interest charges, since the project was initially approved with a $450 million price tag in 2015.

Transportation Minister Claire Trevena emphasized the safety improvement needed in the Kicking Horse Canyon, which has an accident rate three times the average for B.C. highways and areas with effectively no shoulder for vehicles to pull off in an emergency.

RELATED: B.C. Highway 1 widening demanded for decades

RELATED: Single-bridge option chosen for Sicamous section

The average speed for the existing canyon road is 55-65 km/h, causing long backups behind transport trucks and recreational vehicles winding through the scenic route. The objective of the widening is to get the average speed up to 100 km/h as well as enhance safety.

The project will require closure of the Trans Canada Highway from Castle Junction to Golden for an estimated total of 15 weeks. A detour route using Highway 93 and 95 through Radium Hot Springs will add 104 km to the route, approximately an hour and a half of additional travel time.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislature

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Midway mill shutdown expected to last 8 to 10 weeks

Vaagen Fibre Canada cites low inventory, road restrictions as reason for shut down

First presumptive case of coronavirus identified in the Interior Health region

The woman, in her 30s, travelled from Shanghai and lives in the interior

Timberwolves seek fresh lacrosse recruits

New season of the ‘fastest game on two feet’ begins this spring

Missing the Bus: Transit planners trying to fix overcrowding

Part two in a series looking at transit issues in the west Kootenay.

UPDATED: Nakusp to use New Denver playbook to attract doctors to town

Clarification on doctor’s shortage from local clinic manager

VIDEO: Minister reports ‘modest progress’ after blockade talks with First Nation

Wet’suwet’en hereditary chiefs say Coastal GasLink does not have authority to go through their lands

Henrique scores 2 as Ducks soar past Canucks 5-1

Vancouver tumbles out of top spot in Pacific Division

Trudeau cancels Caribbean trip amid pipeline protests across Canada

Protests against Coastal GasLink have disrupted rail service

B.C. VIEWS: Inaction on pipeline protests not a viable response

Columnist Frank Bucholtz on how the Coastal GasLink pipeline dispute got so bad

PHOTOS: Top 10 memories of the 2010 Olympics

Black Press Media’s Jenna Hauck, shares some of her most memorable images of 2010 Winter Games

#FoxForFiver: Support grows in B.C. to put Terry Fox on new $5 bill

Terry Fox’ Marathon of Hope raised money for cancer research

Registration opens soon for BC 55+ Games in Richmond

2020 55+ Games have been officially scheduled for Sept. 15 to 19

Trudeau confers with cabinet ministers as rail blockades continue

The Trudeau government has been criticized for not doing more to end the blockades

Canadian nurses’ unions warn national standards for coronavirus protection too low

President says safety protocols nationwide are inadequate compared to those in Ontario and other countries

Most Read