Minister of Environment and Climate Change Jonathan Wilkinson speaks via video link during a press conference on Parliament Hill in Ottawa on May 14, 2020. The federal government has announced it will join in an environmental assessment of a major expansion to proposed southern British Columbia coal mine. A spokeswoman for Environment Minister Jonathan Wilkinson says the decision was made after analyzing the potential of Teck Resources’ Castle project to cause adverse effects within areas of federal jurisdiction. THE CANADIAN PRESS/Sean Kilpatrick

Federal government to join assessment of Teck coal mine expansion in B.C.

Contamination was a main concern of eight interveners who asked Ottawa to assist B.C. in reviewing the expansion

The federal government will join an environmental assessment of a major expansion to a proposed southern British Columbia coal mine.

“The potential for adverse effects … may not be mitigated through project design, the application of standard mitigation measures, or through existing legislative mechanisms,” says an analysis from the Impact Assessment Agency of Canada.

Environment Minister Jonathan Wilkinson used the analysis to make his decision, released Wednesday, on the Teck Resources project.

He had already reversed an earlier ruling and announced that Ottawa would take part in a review of the proposed Vista coal project in Alberta. Several other companies have made known their plans to mine coal in that province.

Teck is planning an expansion to its network of coal mines in the Elk Valley area of southeastern B.C. The Castle project would increase the area being mined by about one-third and allow the company to maintain production of steel-making coal at 27,400 tonnes a day.

The review involves fisheries, First Nations and international relations — all areas of federal jurisdiction. The mine expansion would also produce significantly more coal than the threshold required for a federal review.

Teck spokesman Chad Pederson called Wednesday’s announcement an “unfortunate decision.”

“The Castle project has already been proceeding through a rigorous provincial environmental review process,” he said in a statement.

“We will work with the B.C. Environmental Assessment Office and the Impact Assessment Agency of Canada to ensure a co-ordinated review and seek to avoid duplication.”

Wilkinson was not available for an interview.

B.C. Environment Minister George Heyman said the province will co-ordinate federal involvement.

“I appreciate that they understand and have committed to working within provincial timelines while they review matters of federal jurisdiction, such as trans-border issues,” he said in an email.

Lars Sander-Green of Wildsight, one of the groups that asked for a federal assessment, thanked Wilkinson for the decision.

“If Teck can’t show how they can reduce selenium pollution downstream of their mines in the long term … then no reasonable environmental assessment should approve this mine,” he wrote.

The decision also has implications for Alberta, where the government has said it hopes to increase the province’s production of steel-making coal.

Ian Urquhart, conservation director for the Alberta Wilderness Association, welcomed the Teck decision.

“The federal process is a more open, accessible process” — especially compared with Alberta’s, he said.

Urquhart said Ottawa had little choice but to step in.

Teck’s Pederson said the Castle project is ”part of the existing Fording River operations and is necessary to maintain the associated jobs and economic activity.”

The company’s existing mines in the area are responsible for significant problems with selenium, an element toxic in large amounts. Reports on concentrations in area waterways show levels up to four times B.C.’s maximum for drinking water. Monitoring stations near the mines have reported levels 50 times what’s recommended for aquatic health.

READ MORE: Castle Project to expand Teck Coal operations

READ MORE: Conservation groups call for federal assessment of Teck’s Castle Mine

Teck’s own research has reported the near-disappearance of rare cutthroat trout from a 60-kilometre stretch of the Fording River downstream from the company’s four mines.

That water flows into the cross-border Koocanusa Reservoir. The reservoir drains into the Kootenai River, which flows about 200 kilometres across Montana and Idaho.

That contamination was a main concern of eight interveners who asked Ottawa to assist British Columbia in reviewing the expansion.

Those interveners included five First Nations on both sides of the border, 34 environmental organizations and the U.S. Environmental Protection Agency.

“Direct and cumulative impacts from coal mining in the Elk Valley have resulted documented impacts to Lake Koocanusa and the Kootenai River water quality, fish and fish habitat in the U.S,” says the protection agency’s submission.

Urquhart suggests Wilkinson’s Teck and Vista decisions are a warning to the Alberta government, which recently revoked a decades-old policy restricting coal development in the province’s foothills and mountains.

“The issue this creates for Alberta is just how difficult it is, even with changes to the coal policy, to have as much control over coal development as (cabinet ministers) would like the province to have.”

— By Bob Weber in Edmonton.

The Canadian Press


Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

coal mine

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

COVID-19. (Courtesy of CDC).
Interior Health reports 12 additional COVID-19 cases

The total number of cases in the region is now at 644

The centre will open up for child care services on Nov. 2. File photo
Construction complete on Goat Mountain Child Care Centre

Centre staff will begin delivering child care services on Nov. 2

The house is located near two schools. Photo: Connor Trembley
Dog attack seriously injures young boy in Castlegar

Despite investigating the incident, city staff aren’t confirming if the dog has been put down

Kootenay West Candidates (L to R) Glen Byle (Conservative), Katrine Conroy (NDP), Andrew Duncan (Green), Corbin Kelley (Liberal), Fletcher Quince (Independent, Ed Varney (Independent).
Q&A with Kootenay West candidates: Affordable housing

Eighth in a series of Q&As with the candidates.

Environment Canada has issued a snow warning for the Kootenays on Friday. File photo
Environment Canada issues snow warning for Friday

Two-to-10 centimetres is expected to fall

Vancouver police reactivated the search for Jordan Naterer Thursday Oct. 22. Photo courtesy of VPD.
Mom of missing Manning Park hiker believes her son is waiting to come home

‘He’s going to come out of a helicopter and say ‘what took you so long?”

Environment Minister George Heyman, Premier John Horgan and Energy Minister Michelle Mungall announce that B.C. Hydro is proceeding with construction of the Site C dam, Dec. 11, 2017. (Tom Fletcher/Black Press)
Site C actions, costs won’t be known until after B.C. election, Horgan says

Peace River diverted for construction of reinforced dam base

One of the squirrels who ended up having their tails amputated after getting them stuck together with tree sap. (Facebook/Wild ARC)
Squirrels recovering from tail amputation after sap situation near Victoria

BC SPCA Wild ARC says squirrels will be released back into wild, fifth sibling was euthanized

More and more electric cars are on the road, but one Chevy Bolt owner was shocked to see how much his BC Hydro bill skyrocketed once he started charging the vehicle. (Black Press file photo)
Lower Mainland man sees significant spike in BC Hydro bill after buying electrical vehicle

An increase should be expected, but Brian Chwiendacz experienced a 200-plus per cent hike

The Anonymous YVR is an Instagram page that reviews restaurants and other establishments around B.C. based on how well they adhere to COVID-19 rules. (Instagram)
Anonymous Instagram page reviews COVID-19 safety measures at B.C. businesses

There are a number of public health orders various types of establishments must follow to slow virus’s spread

Jordan Naterer, an electrical engineer from Vancouver, was last seen Saturday Oct. 10. (Facebook photo)
Search efforts to resume for missing Manning Park hiker; Trudeau speaks on case

PM says he’ll do what he can to ‘nudge’ efforts to find Jordan Naterer, yet has little leverage locally

Most Read