Construction camp for Toba Inlet run-of-river power project on B.C. coast east of Campbell River, 2009. (Tom Fletcher/Black Press)

B.C.’s private power vision shows up as big charge to hydro bills

NDP tracks B.C. Liberal donations while long-term contracts signed

Former B.C. premier Gordon Campbell’s rush into private electricity projects has turned into a high-voltage political battle over their long-term impact on B.C. Hydro rates.

As the NDP government gets ready to announce electricity rate increases to cover the $10 billion Site C dam and $5.5 billion in deferred debt from utility operations that kept rates artificially low during the B.C. Liberal years, it has issued a new report on the impact of run-of-river and other private power deals that Campbell’s government launched in 2002.

Those contracts with mainly run-of-river hydro, wind and biomass power producers, are expected to cost the utility $16 billion over the next 20 years, according to a new report commissioned by the government from former B.C. Treasury Board director Ken Davidson. Entitled “Zapped,” the report calculates the extent of what the opposition NDP said at the time, that B.C. Hydro was paying over market price for intermittent power that is generated mostly in spring when B.C.’s large dams are at full capacity.

RELATED: NDP’s Horgan reluctantly proceeds with Site C dam completion

RELATED: In 2011, Andrew Weaver was pushing for run-of-river power

Campbell’s 2002 B.C. Energy Plan set the direction, ordering B.C. Hydro to expand its electricity supply through long-term purchase contracts with private suppliers. The plan also required the utility to become self-sufficient in energy, rather than buying surplus power on the North American grid that may be from fossil fuel sources.

As Energy Minister Michelle Mungall prepared to release results of the NDP government’s review of B.C. Hydro performance Thursday, the political battle began with the NDP adding up $3 million in campaign donations collected by the B.C. Liberals from private power producers as their business boomed in B.C.

Campbell’s vision of B.C. as a climate change leader and clean energy exporter to California to replace fossil fuel sources was soon undone by technology and global events.

“Market prices for natural gas, and hence for electricity, remained strong until 2008,” Davidson’s report says. “The financial crash of 2008 reduced demand and prices. Unfortunately, this crash was timed with a major development in the oil and gas industry, which wasn’t fully appreciated until large amounts of new gas appeared in the market: shale gas and oil and hydraulic fracturing.”

B.C.’s private power contracts included biofuel cogeneration at sawmills and pulp mills, wind energy in the Peace region and the biggest player, run-of-river hydro. One of the largest-scale projects was by Plutonic Power on the Homathco River at Toba Inlet on the B.C. coast.

A second, larger phase with multiple river sites at Bute Inlet was cancelled as California and other major energy markets embraced gas-fired power.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislature

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Midway mill shutdown expected to last 8 to 10 weeks

Vaagen Fibre Canada cites low inventory, road restrictions as reason for shut down

First presumptive case of coronavirus identified in the Interior Health region

The woman, in her 30s, travelled from Shanghai and lives in the interior

Timberwolves seek fresh lacrosse recruits

New season of the ‘fastest game on two feet’ begins this spring

Missing the Bus: Transit planners trying to fix overcrowding

Part two in a series looking at transit issues in the west Kootenay.

UPDATED: Nakusp to use New Denver playbook to attract doctors to town

Clarification on doctor’s shortage from local clinic manager

VIDEO: Ottawa wants quick, peaceful resolution to pipeline protests, Trudeau says

The protests have manifested themselves as blockades on different rail lines across the country

Canucks acquire forward Tyler Toffoli from Kings in push for playoffs

Vancouver sends Schaller, Madden, pick to L.A.

New highway proposed between Alberta and B.C.

The route would connect Red Deer to Kamloops

Wet’suwet’en and B.C. government have been talking Aboriginal title for a year

Coastal GasLink says it has agreements with all 20 elected First Nations councils along the 670-kilometre route

Trudeau tightlipped on plan to end protests ‘quickly and peacefully’

The prime minister, who cancelled a two-day trip to Barbados this week to deal with the crisis at home

B.C. budget expected to stay the course as economic growth moderates

Finance minister said ICBC costs have affected budget

Canadian standards for coronavirus protection to be reviewed, health agency says

The protocols set out how health workers should protect themselves and their patients

Monday marks one-year anniversary of man missing from Langley

42-year-old B.C. man, Searl Smith, was last seen leaving Langley Memorial Hospital on Feb. 17, 2019

BC Ferries sailings filling up Family Day Monday

More than 20 sailings added between Swartz Bay and Tsawwassen for long weekend

Most Read